Commissioning Checklist (Template)
Facilities
Power verified (voltage, current capacity)
Network ports / VLAN / IP addressing approved
Utilities verified (CDA/exhaust/cooling)
Permits + inspections complete (if needed)
Safety
E-stop functional test
Door/light curtain interlocks verified
Emergency vent / pressure relief (if applicable)
LOTO plan accessible + reviewed
Controls
PLC/firmware version matches release lock
HMI build matches release lock
Alarm taxonomy loaded + verified
Hardware
Wiring continuity passed
Actuators homed safely
Calibration complete (as needed)